Brand Name : ShiTan
Model Number : ST-260
Certification : ISO9001
Place of Origin : China
MOQ : Negotiation
Price : Negotiation
Payment Terms : L/C, D/A, T/T, Western Union
Supply Ability : 1000year
Delivery Time : Within 7-12 days
Packaging Details : Naked
Type : Crawler Mounted Drill Rig
Power Type : Diesel
Driving way : Hydraulic driving
Usage : Geological core drilling
Voltage : 380V
name : well drilling equipment
Air pressure : 1.25-3.5Mpa
Weight of the rig : 4m×1.7m×2.2m
Crawler Drilling Rig For Water Well Drilling Rig Machine Driven By Diesel Engine
Introduction of 200 crawler type water well drilling rig:
The Pneumatic Water Well Drilling Rig can create drilling jobs in different strata, borehole diameter can up to 140-325mm. The crawler water drilling rig with hydraulic technology,supporting high torque hydraulic motor rotation and large bore hydraulic cylinder push, the multi cylinder engine of famous factory provides power for the hydraulic system, two stage air filter, air compressor air intake design, prolong the service life of diesel engine. Special pump set design is convenient for maintenance and reduce the cost of maintenance. Centralized control of the hydraulic control table, convenient operation.
Weight of whole machine6 | 5.5T |
Drilling caliber | 140-254mm |
Drilling depth | 200m |
One-time push length | 3.3m |
Walking speed | 2.5km/h |
Climbing ability |
Max. 30 |
Power of main machine | 76kw |
Working pressure | 1.7-2.5mpa |
Air consumption | 17-31m3/min |
Diameter of drill rod | 76, 89mm |
Length of drill rod | 1.5, 2.0, 3.0m |
Lifting force | 12T |
Rotation speed | 45-65rpm |
Rotation torque | 3200-4600N.m |
Dimension | 3800*1500*2200mm |
Why is the water well drilling rig not suitable for use in rainy days?
After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.
Water Well 380V Crawler Drilling Rig Machine Driven By Diesel Engine Images |
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Help